Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
Cherry BX-2
Vertical Stabilizer
7-26-2016
< Previous Log Entry
Next Log Entry >
Date:
7-26-2016
Number of Hours:
0.00
Manual Reference:
Brief Description:
Nosewheel and Rudder Steering
The crossing of the wires in the rear of the fuselage was supplied by an other hose to make sure they don't shear each other off. Also at the very end where the cable leaves the fuselage a added a hose for precise guidance.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cherry BX-2 Home
Category
# Logs
# Hours
All
482
4021
Avionics/Instrument
8
12
Electrics/Instrument
8
12
Engine
63
176
Fuselage
151
306
Horizontal Stab.
32
68
Miscellaneous
1
2
Prebuilding Hours no
1
3000
Projectinspection
5
10
Prop
12
42
Retractable Gear
97
252
Seating
14
21
Stand
4
15
Tank
60
52
Vertical Stabilizer
19
43
Wing Loading Test
4
10
Workshop
3
Copyright © 2001-2024 Matronics. All Rights Reserved.